Continuous sludge dewatering equipment with integrated thickening, low-speed screw compression and self-cleaning moving and fixed rings for municipal and industrial wastewater applications.
Efficient Sludge Dewatering for Continuous Operation
A product-level view of the equipment duty, process position and functional zones.
A multi-disc screw press is mechanical sludge-dewatering equipment used after the selected sludge-conditioning steps. Its process duty is to separate water from conditioned sludge so that the remaining cake is easier to handle, transport or route to the approved downstream destination.
The equipment combines flocculation, progressive thickening and dewatering within a compact process train. Moving and fixed rings around the low-speed screw create a self-cleaning filtration structure intended to reduce screen blockage during continuous operation.
The KS series includes 15 models from KS-131 to KS-404. Reference duties cover five sludge conditions at 0.2% to 5.0% total solids, but final capacity still depends on the actual sludge, polymer response, operating schedule and target cake condition.
For broader engineering context on mechanical dewatering, sludge conditioning and feed-solids effects, see the U.S. EPA sludge-dewatering design manual. Its historical numerical examples are not used as current KUOSI specifications or project guarantees.
Functional mapEquipment-level view
01
Conditioned sludge inlet
Receives sludge after the selected polymer preparation and flocculation step.
02
Gravity thickening zone
Begins free-water separation before the pressure-dewatering section.
03
Progressive dewatering zone
Applies increasing mechanical pressure as material moves toward discharge.
04
Ring cleaning zone
Moving and fixed rings support continuous filtration-surface cleaning.
05
Cake discharge
Routes dewatered cake to the selected conveyor, container or downstream handling arrangement.
Engineering advantages
Why Use a Screw Press?
Evaluate the equipment through operating implications, not decorative feature claims.
01
Low-speed, low-energy drive
The KS model range uses a 2–4 rpm screw speed, 0.2–9.55 kW main drive power and a 0.01–0.1 kWh/kg-DS reference energy range.
02
Low wash-water requirement
The moving and fixed ring structure supports self-cleaning without relying on continuous high-volume wash water.
03
Automatic operation
The standard arrangement integrates metering, flocculation, dewatering and discharge for continuous automatic operation within the selected control strategy.
04
Low clogging risk
Relative ring movement supports filtration-surface cleaning and helps reduce blockage risk.
05
Compact footprint
Thickening and dewatering duties are combined in an integrated equipment arrangement.
06
Application flexibility
The model table includes raw-water chemical sludge, excess sludge, pressurized-flotation sludge and mixed or digested municipal sludge reference duties.
Applications
Typical Sludge Dewatering Applications
Application fit must be confirmed from sludge characteristics, conditioning response and the required downstream handling duty.
01
Municipal wastewater
Waste activated sludge or combined municipal sludge routed from the selected treatment and solids-management process.
Watch conditioned sludge move from the flocculation section into the multi-disc dewatering drum and toward cake discharge. The footage provides an operating reference for the sequence described on this page: feed conditioning, progressive water separation and final solids discharge. Use it to understand equipment layout and material movement, not as a guaranteed performance test. Actual throughput, capture, cake condition and polymer demand depend on the sludge, selected model and operating settings.
What to look for
Conditioned sludge entering the dewatering section after flocculation.
Material moving through the low-speed multi-disc screw assembly.
Dewatered cake reaching the discharge end for downstream handling.
Playback starts only after you choose to play. The cover image is supplied by the GL Environment YouTube video.
System configuration
Typical Screw Press System Configuration
The dewatering duty sits within a wider feed, conditioning, separation and cake-handling system.
System referenceApproved screw press system-configuration diagram
Final interfaces and included equipment are defined by the agreed project scope.
Before releaseConfiguration decisions to confirm
01
Wetted-part material
Confirm the required material from sludge chemistry, corrosion conditions and the approved equipment model.
02
Ring and spacer construction
Verify ring, spacer and filtration-gap details against the selected KUOSI model data.
03
Screw wear protection
Review sludge abrasiveness and the available screw-blade protection for the actual duty.
04
Motor and reducer
Match power supply, duty and reducer selection to the confirmed model and project standard.
05
Control environment
Define enclosure, installation environment, control philosophy and interlock requirements.
06
Instrumentation scope
Confirm level, flow, dosing and alarm signals required for integration with the wider plant.
S1
Sludge feed
A selected feed pump transfers sludge from storage or the preceding process.
C1
Polymer preparation
Prepared polymer supports the selected conditioning duty.
C2
Flocculation
Controlled mixing creates the feed condition required for mechanical separation.
S2
Screw press
Thickening and mechanical dewatering reduce the water carried with the sludge.
R1
Filtrate discharge
Separated liquid is routed according to the overall plant mass balance.
R2
Dewatered cake
Cake moves to the approved conveying, storage, transport or disposal route.
Main equipment
Multi-Disc Screw Press
Supporting / optional equipment
Polymer Preparation Unit
Sludge Feed Pump
Polymer Dosing Pump
Control Cabinet
Cake Conveyor
Sludge Storage / Holding
Technical data
Models & Specifications
Capacity and flow ranges span five sludge categories at 0.2–5.0% TS. Units for the listed dimensions, weights and wash-water values require confirmation. Final model selection and guaranteed performance require an approved project data sheet and actual sludge evaluation.
↔ Scroll horizontally to review all technical fields on smaller screens.
Model
DS capacity range
Reference flow range
Drive power
Wash-water value
L × W × H
Net / operating weight
KS-131
4–26 kg-DS/h
0.4–2.0 m³/h
0.2 kW
24
1870 × 730 × 1170
205 / 300
KS-132
8–52 kg-DS/h
0.8–4.0 m³/h
0.3 kW
48
2000 × 960 × 1230
275 / 425
KS-201
8–52 kg-DS/h
0.8–4.0 m³/h
0.74 kW
32
2690 × 880 × 1500
320 / 470
KS-202
16–104 kg-DS/h
1.6–8.0 m³/h
1.11 kW
64
2810 × 1120 × 1600
470 / 730
KS-301
20–130 kg-DS/h
2.0–10.0 m³/h
1.5 kW
40
3310 × 1000 × 1700
910 / 1320
KS-302
40–260 kg-DS/h
4.0–20.0 m³/h
2.25 kW
80
3500 × 1300 × 1700
1350 / 2130
KS-303
60–390 kg-DS/h
6.0–30.0 m³/h
3 kW
120
3700 × 1650 × 1700
1820 / 2880
KS-351
40–260 kg-DS/h
4.0–20.0 m³/h
1.1 kW
72
3610 × 1100 × 1850
1610 / 2210
KS-352
80–520 kg-DS/h
8.0–40.0 m³/h
2.75 kW
144
3820 × 1490 × 1850
2300 / 3400
KS-353
120–780 kg-DS/h
12.0–60.0 m³/h
5.7 kW
216
4120 × 1770 × 1850
3350 / 4850
KS-354
160–1,040 kg-DS/h
16.0–80.0 m³/h
9.55 kW
288
4320 × 2290 × 1850
4500 / 6100
KS-401
70–442 kg-DS/h
6.5–35.0 m³/h
1.85 kW
80
4550 × 1180 × 2250
2500 / 3400
KS-402
135–884 kg-DS/h
13.6–67.5 m³/h
2.95 kW
160
4870 × 1710 × 2250
3480 / 5200
KS-403
200–1,326 kg-DS/h
20.4–100 m³/h
4.05 kW
240
4790 × 2550 × 2250
4550 / 7050
KS-404
266–1,768 kg-DS/h
27.2–133 m³/h
5.15 kW
320
4840 × 3140 × 2250
6550 / 9660
Equipment selection
How to Select the Right Screw Press
Selection begins with sludge and duty data; wastewater flow alone is not an adequate sizing basis.
01
Sludge type
Identify the source process and whether the feed is primary, biological, chemical or combined sludge.
02
Sludge concentration
Provide the expected feed-solids range, including normal and variable conditions.
03
Required dry-solids capacity
Define the mass of dry solids to be processed over the available operating period.
04
Operating hours
Confirm daily and weekly availability, batch constraints and redundancy expectations.
05
Required cake condition
Describe the downstream handling route and target moisture or solids content, if known.
06
Polymer conditions
Share polymer type, preparation method, trial results and dose information when available.
07
Installation environment
Confirm footprint, access, climate, corrosion context, voltage and integration constraints.
Manufacturing & installation evidence
Real Screw Press Equipment Views
These images document KUOSI equipment and installation contexts. They are not presented as quantified project case studies.
01
Manufacturing views
Real equipment imagery from KUOSI's existing Screw Press product material.
Equipment assembly and workshop viewFactory equipment inspection viewDrive and equipment assembly view
02
Installation & operation views
Site imagery showing handling, installation and operating context.
Equipment handling before shipmentDischarge-area operating viewInstalled twin-drive equipment view
Engineering support
From Equipment Selection to System Integration
Support is presented as a practical engineering workflow, without unverified company statistics or outcome claims.
01
Application review
Review the available wastewater and sludge conditions before equipment selection.
02
Equipment sizing
Evaluate equipment capacity from the actual process duty and operating schedule.
03
System configuration
Define the required feed, polymer, control and cake-handling interfaces.
04
Technical documentation
Prepare the applicable drawings, technical data and installation requirements.
05
Commissioning support
Provide installation and commissioning guidance according to the agreed project scope.
The answers separate general selection logic from the values that require a project-specific technical review.
01What types of sludge can a screw press handle?+
Municipal and industrial sludge can be evaluated, including biological, physical-chemical and combined sludge. Suitability depends on solids characteristics, conditioning response and the required dewatering duty; it should be confirmed from project data or testing.
02What feed sludge concentration is suitable?+
Model duties cover 0.2%, 1.0%, 2.0%, 3.0% and 5.0% total solids for different sludge categories. These are selection references, not a universal operating envelope; confirm the actual sludge, polymer response and required throughput.
03What cake moisture can be achieved?+
Listed capacities use sludge cake below 85% water content as a reference basis. Actual cake moisture varies with sludge type, feed concentration, polymer conditioning, throughput and operating settings, so project performance must be confirmed from tests or verified application data.
Selection uses required dry-solids throughput, calculated from the sludge flow and solids concentration, together with operating hours and sludge-specific performance evidence. Wastewater flow alone is not the sizing basis.
Polymer type and dose depend on sludge chemistry and flocculation response. Bench or site testing is the appropriate basis when no verified operating data is available.
Model values range from 24 to 320, but the unit requires confirmation. Confirm the required flow, pressure, cleaning sequence and unit on the approved model data sheet before design.
07What is the difference between a screw press and a belt filter press?+
Both mechanically dewater conditioned sludge, but they use different separation structures, cleaning arrangements, footprints and operating regimes. A comparison should use the actual sludge, capacity, cake target, utility limits and maintenance context.
Provide sludge source, feed concentration, required dry-solids capacity, operating schedule, polymer information, cake-handling requirement and site constraints. KUOSI can then evaluate the appropriate model and supporting system scope.
Engineering inquiry
Need Help Selecting the Right Screw Press?
Share your sludge characteristics, required treatment capacity and operating conditions. KUOSI can use the available information to begin evaluating the appropriate model and system configuration.