Skip to content

About KUOSI

Engineering Water Treatment Equipment for Real-World Applications

KUOSI supplies application-engineered equipment for sludge dewatering, solid-liquid separation, dissolved air flotation, chemical dosing and on-site disinfection—from equipment selection through commissioning support.

Who we are

Focused on Practical Water Treatment Engineering

KUOSI is a water and wastewater treatment equipment brand of Shanghai GL Environmental Technology Co., Ltd. This website focuses on how KUOSI equipment is applied within practical treatment solutions for municipal and industrial projects, covering sludge dewatering, solid-liquid separation, dissolved air flotation, chemical dosing and on-site disinfection.

We begin with the treatment objective and actual process conditions—not a standard catalogue. Wastewater or sludge characteristics, required capacity, operating schedule, existing process interfaces and site constraints are reviewed before the equipment configuration and supporting scope are defined.

Explore our treatment approach

What we do

Equipment and Systems Across Key Treatment Processes

Each capability connects a treatment duty to typical applications and the equipment used to support it.

  1. 01

    Sludge Treatment

    Sludge thickening and dewatering equipment for reducing sludge volume and supporting downstream handling.

    Typical applications include municipal WWTP sludge lines and industrial lagoon sludge dewatering prior to disposal.

  2. 02

    Solid-Liquid Separation

    Treatment systems for suspended solids, fats, oils and other contaminants that are difficult to settle by gravity alone.

    Typical applications include food and beverage effluent pre-treatment and industrial wastewater with high FOG content.

    Related equipment
  3. 03

    Disinfection

    On-site generation equipment for producing sodium hypochlorite as part of a defined water or wastewater disinfection duty.

    Typical applications include final effluent disinfection at municipal WWTP and process water treatment for reuse.

  4. 04

    Chemical Preparation & Dosing

    Chemical preparation and controlled dosing systems that support conditioning and selected wastewater treatment processes.

    Typical applications include coagulant dosing ahead of DAF units and polymer dosing for sludge conditioning.

Our approach

Engineering Starts With Process Conditions

KUOSI uses a five-stage review process to move from application data and design conditions to equipment configuration, manufacturing review and project integration.

  1. 01

    Understand the Application

    • Wastewater source
    • Sludge characteristics
    • Treatment target
    • Existing process
  2. 02

    Define Design Conditions

    • Treatment capacity
    • Operating hours
    • Required performance
    • Site conditions
  3. 03

    Select & Configure

    • Equipment model
    • Materials
    • Supporting systems
    • Instrumentation & controls
  4. 04

    Manufacture & Review

    • Order scope
    • Equipment assembly
    • Inspection points
    • Agreed factory checks
  5. 05

    Support Integration

    • Technical drawings
    • Installation guidance
    • Commissioning guidance
    • Applicable documentation

The selection basis remains visible. Final capacity, materials, controls and support scope are confirmed against project data rather than assumed from a standard package.

See the process logic
Steel-framed factory workshop with water-treatment equipment arranged on the production floor
Factory production floor and equipment preparation

Manufacturing & quality evidence

Built for Industrial Operation

Workshop views document production-floor capacity, multi-unit preparation, mechanical assembly and equipment integration before project delivery.

Workshop & equipment assembly
Visible production-floor evidence
Multi-unit preparation
Equipment staged for assembly and review
Drive & equipment integration
Mechanical assembly evidence

Equipment-specific fabrication details, inspection records and production scope are confirmed against the agreed order and applicable documentation.

Manufacturing video

See Screw Press Manufacturing on the Production Floor

This factory video provides a direct view of screw-press manufacturing and equipment preparation within the GL Environment production environment. It complements the workshop photographs by showing scale, work areas and assembled equipment in motion rather than presenting a staged product rendering. The footage is manufacturing evidence only: it does not by itself verify a particular model specification, production capacity, inspection result or dewatering performance. Those details remain subject to the approved order and technical documentation.

What to look for

  • The production-floor context in which screw-press equipment is prepared.
  • Physical equipment scale and assembly evidence beyond isolated product images.
  • The boundary between manufacturing footage and verified project performance data.
Watch on the GL Environment YouTube channel
Playback starts only after you choose to play. The cover image is supplied by the GL Environment YouTube video.

Quality control

Quality Checked From Configuration to Delivery

The review sequence follows the equipment type and confirmed order scope, from configuration checks through final release.

  1. Q1

    Scope Confirmation

    Confirm the selected configuration, materials, interfaces and order-specific requirements before production review.

  2. Q2

    Assembly Review

    Review the mechanical assembly and the included piping, electrical or supporting items against the confirmed scope.

  3. Q3

    Functional Check

    Define applicable operating and critical-function checks according to the equipment type and agreed inspection plan.

  4. Q4

    Final Release Review

    Check the completed configuration, applicable documentation and shipment preparation before release.

Inspection procedures, test records and acceptance criteria are confirmed according to the equipment type and agreed project scope.

Technical documentation

Engineering Information for Project Integration

Project-specific information supports civil, mechanical, electrical and operating integration. Available documents are confirmed with the equipment type and agreed scope.

01Technical datasheets
Equipment-specific
02General arrangement & dimensions
Project-specific
03Installation requirements
Applicable scope
04System interface information
Configuration-specific
05Electrical information
Where included
06Operating documentation
Where included
07Maintenance guidance
Where included

Application experience

Equipment Applied Across Municipal and Industrial Treatment

KUOSI evaluates equipment around the treatment duty, wastewater or sludge conditions, operating schedule and site requirements of each application.

01

Municipal

Municipal Wastewater Applications

Equipment evaluation for municipal treatment duties and plant upgrades.

  • Municipal wastewater treatment

    Equipment selection for new treatment lines, plant upgrades and defined process duties.

  • Sludge dewatering

    Screw press configuration based on sludge characteristics, capacity and operating schedule.

  • WWTP equipment upgrades

    Replacement or additional equipment configured around existing process interfaces and site constraints.

  • Effluent disinfection and reuse preparation

    On-site disinfection equipment for final effluent treatment and water reuse duties.

  • Chemical dosing for nutrient or pH control

    Controlled dosing systems for nutrient removal, conditioning and pH adjustment.

02

Industrial

Industrial Wastewater Applications

Application review around the actual production wastewater and treatment objective.

  • Food & beverage

    DAF and sludge dewatering for FOG-heavy effluent pre-treatment

  • Chemical processing

    Chemical dosing and pH control for process effluent conditioning

  • Textile

    Solid-liquid separation for dye-loaded wastewater

  • Paper & pulp

    Sludge dewatering for fibre-heavy process sludge

  • Other industrial wastewater

    Application reviewed against actual wastewater characteristics and treatment duty

Work with KUOSI

Discuss Your Water Treatment Project With Our Engineers

To begin an application review, share the available flow rate, wastewater or sludge characteristics, operating hours, treatment target and site constraints.

KUOSI engineers can support: pre-sales application review equipment configuration technical documentation commissioning guidance

Project inquiry

Tell us about your requirement

Required fields are marked with an asterisk. This form is for engineering inquiries, product selection and project consultation.

Enter your company name.

Enter your name.

Enter a valid work email address.

Enter your country or region.

Select a product or solution interest.

Useful context can include the application, treatment objective, available flow or capacity, existing process, target equipment and site constraints.

Describe your project or treatment requirement.